The list of projects executed by Korona includes the following:
- 2003: Sub-contractor to F Malawi Engineering for the
installation of Public Address System at the Bank of Ghana in Accra.
- 2003-2004: Sub-contractor to F Malawi Engineering for
the installation of Public Address System at Cedi House in Accra.
- 2004: Installation of Capacitor Bank for Coca-Cola
Company in Accra.
- 2004: Several residential wiring works, with standby
generators.
- UPS installation and commissioning for Volta River
Authority.
- 2006-2007: Sub-contractor to Techno-Systems Ghana
(TSG) Ltd for the Installation of Public Address System, Telephone
Exchange, LAN, Flight Information Display System (FIDS) and CCTV at
Kotoka International Airport in Accra, Ghana.
- 2007-2009: Sub-contractor to Techno-Systems Ghana
(TSG) Ltd for the Installation of Public Address System, Telephone
System, LAN, X-Ray scanners, Access Control, and CCTV at Parliament
House in Accra, Ghana.
- 2008: Installation of electrical wiring system at the
British High Commission in Accra.
- 2003-2009: Installation of Power System
Communications equipment at various substations of Volta River Authority
in Ghana.
- Installation of two new 11/0.433-0.24kV transformers,
Capacitor Bank and new LV Panels for Nestle Ghana at Tema.
- 2010: Extension of Internet Connectivity to Volta
River Authority Executive/Management Guest Houses in Akuse Township.
- 2011: Provisions of voice, data and video network for
Senchi Royal Hotel and Resort at Atimpoku, Ghana.
- 2011: Installation and commissioning of
communications equipment for the VRA SCADA and Communications Upgrade Project,
as sub-contractor to ABB.
- 2011: Installation and Commissioning of Power Line
Carrier (PLC) Communications equipment for the Ayanfuri Substation
Project, as sub-contractor to Pestech SDN BHD of Malaysia.
|
|